OneXEOS
Manufacturing & logistics

Manufacturing & logistics

Quick guide: Manufacturing & logistics

From raw materials to delivered goods: production orders, bills of materials, quality checks and shipping.

Plan a production run

  1. Define the bill of materials for the product.
  2. Create a production order for the quantity you need.
  3. Check that the materials are in stock before releasing it.

Ship an order

  1. Pick and pack the items against the order.
  2. Assign the carrier and record the tracking code.
  3. Confirm delivery to close the order.

Common mistakes

  • Releasing a production order before checking materials, which stops the line midway.
  • Closing a shipment without a delivery confirmation.

How to use this category

Pick the article that matches what you are doing in the list above, follow the steps in order, then check the result on the matching screen. If something fails, compare it with the questions below or open Troubleshooting; if it is still stuck, contact support.

Frequently asked questions

Can one finished item have several production stages?

Yes. A bill of materials can nest, so a half-finished sub-assembly is itself an item you can count, transfer and cost.

What happens to a batch that fails quality control?

It is held rather than deleted. The quantity stays visible as quarantined stock until someone reworks it or writes it off, so the numbers never quietly disappear.

Can I trace a finished product back to its raw materials?

Yes, by batch. That trace is what makes a recall a phone call rather than a guess.

POSCRMInventoryKDSStaffReportsAI Menu

Ready to upgrade the operating system for your business?

You are ready to upgrade the operating system for your business in about 5 minutes. You create an account, pick your industry and switch on the apps you need, with the core plan free forever. No credit card and no long-term contract. You can add a branch at any point. Everything you turn on shares the same 1 data layer.

Manufacturing & logistics - OneXEOS Help Center